Supply, installation and commissioning of an outside plant optic fibre network including accessories and related civil works.

The challenge
The President's Office — Public Service Commission required a resilient outside plant fibre network linking its facilities, complete with the civil works needed to route and protect the cable. The engagement covered supply of optic fibre cables and accessories, full civil works, installation and commissioning — the largest single contract in the KOTES portfolio.
Our solution
KOTES completed a full route survey, designed the cable route and optical loss budget, then executed trenching, ducting and reinstatement before pulling and splicing the fibre. Every link was terminated, bidirectionally OTDR-tested and certified, with splice records and as-built route drawings handed over on completion.
Outcomes
- High-capacity fibre backbone commissioned and certified end to end
- Civil works, supply and installation delivered under a single accountable contract
- As-built documentation and OTDR traces handed over for in-house fault location
Gallery
Other fibre optic projects
Fibre OpticView project: Last Mile Fibre Optic Cable Infrastructure DeploymentMinistry of Home Affairs
Last Mile Fibre Optic Cable Infrastructure Deployment
Supply and installation of last mile connectivity through dedicated optic fibre cable infrastructure deployment.
- Location
- Tanzania (multiple regions)
- Completed
- 2015 – 2016
- Contract value
- TSh 2,890,627,757
Fibre OpticView project: OPGW Fibre Optic Cable Works for NICTBB RoutesMinistry of Communication & ICT
OPGW Fibre Optic Cable Works for NICTBB Routes
Construction, installation, testing and commissioning services for OPGW optic fibre cable on National ICT Broadband Backbone routes.
- Location
- Tanzania (NICTBB routes)
- Completed
- 2022 – 2023
- Contract value
- TSh 984,597,852
Fibre OpticView project: Fibre Infrastructure for Nelson Mandela Institute of Science & TechnologyNelson Mandela African Institution of Science and Technology
Fibre Infrastructure for Nelson Mandela Institute of Science & Technology
Supply and installation of fibre infrastructure across the NM-AIST campus under competitive tender.
- Location
- Arusha, Tanzania
- Completed
- 2024 – 2025
- Contract value
- TSh 509,798,975