Last Mile Fibre Optic Cable Infrastructure Deployment

Supply and installation of last mile connectivity through dedicated optic fibre cable infrastructure deployment.

Ministry of Home AffairsTanzania (multiple regions)2015 – 2016
Structured cabling patch panel with numbered ports and connected patch leads

The challenge

The Ministry required last mile fibre optic infrastructure to bring high-capacity connectivity from backbone points of presence into its own facilities across multiple regions, without disrupting operational policing services.

Our solution

KOTES surveyed each route, designed the last-mile fibre paths and executed deployment site by site. Work was phased so that each location was cut over individually, with testing and certification completed before the team moved on.

Outcomes

  • Last-mile fibre infrastructure delivered across multiple regional sites
  • Phased cutover kept operational services running throughout deployment
  • Certified links handed over with per-site optical test records

Gallery

  • Fibre optic distribution frame with rows of terminated patch cords
  • Technical drawings and design documentation laid out on a desk
More work
  • Fibre optic distribution frame with rows of terminated patch cords
    Fibre Optic

    President's Office — Public Service Commission

    Outside Plant Fibre Optic Network for the President's Office

    Supply, installation and commissioning of an outside plant optic fibre network including accessories and related civil works.

    Location
    Dar es Salaam, Tanzania
    Completed
    2015 – 2016
    Contract value
    TSh 3,460,997,988
    View case study
    View project: Outside Plant Fibre Optic Network for the President's Office
  • Fibre optic distribution frame with rows of terminated patch cords
    Fibre Optic

    Ministry of Communication & ICT

    OPGW Fibre Optic Cable Works for NICTBB Routes

    Construction, installation, testing and commissioning services for OPGW optic fibre cable on National ICT Broadband Backbone routes.

    Location
    Tanzania (NICTBB routes)
    Completed
    2022 – 2023
    Contract value
    TSh 984,597,852
    View case study
    View project: OPGW Fibre Optic Cable Works for NICTBB Routes
  • Structured cabling patch panel with numbered ports and connected patch leads
    Fibre Optic

    Nelson Mandela African Institution of Science and Technology

    Fibre Infrastructure for Nelson Mandela Institute of Science & Technology

    Supply and installation of fibre infrastructure across the NM-AIST campus under competitive tender.

    Location
    Arusha, Tanzania
    Completed
    2024 – 2025
    Contract value
    TSh 509,798,975
    View case study
    View project: Fibre Infrastructure for Nelson Mandela Institute of Science & Technology

Start a conversation

Tell us what you need to build, connect or protect

Send us the scope, the site list or just the problem. We will come back with a route, a plan and an itemised quotation.