Fibre Optic

Fibre Infrastructure for Nelson Mandela Institute of Science & Technology

Supply and installation of fibre infrastructure across the NM-AIST campus under competitive tender.

Nelson Mandela African Institution of Science and TechnologyArusha, Tanzania2024 – 2025
Structured cabling patch panel with numbered ports and connected patch leads

The challenge

NM-AIST required campus-wide fibre infrastructure to connect academic, research and administrative buildings with the capacity that research workloads demand.

Our solution

KOTES won the tender and delivered survey, design, civil works, cabling, splicing and certification across the campus, integrating the new routes with existing campus distribution points.

Outcomes

  • Campus-wide fibre infrastructure supplied and installed
  • Research-grade capacity delivered between academic buildings
  • Certified links documented for campus IT to maintain

Gallery

  • Fibre optic distribution frame with rows of terminated patch cords
  • Data centre racks filled with dense structured cabling and status indicators
More work
  • Fibre optic distribution frame with rows of terminated patch cords
    Fibre Optic

    President's Office — Public Service Commission

    Outside Plant Fibre Optic Network for the President's Office

    Supply, installation and commissioning of an outside plant optic fibre network including accessories and related civil works.

    Location
    Dar es Salaam, Tanzania
    Completed
    2015 – 2016
    Contract value
    TSh 3,460,997,988
    View case study
    View project: Outside Plant Fibre Optic Network for the President's Office
  • Structured cabling patch panel with numbered ports and connected patch leads
    Fibre Optic

    Ministry of Home Affairs

    Last Mile Fibre Optic Cable Infrastructure Deployment

    Supply and installation of last mile connectivity through dedicated optic fibre cable infrastructure deployment.

    Location
    Tanzania (multiple regions)
    Completed
    2015 – 2016
    Contract value
    TSh 2,890,627,757
    View case study
    View project: Last Mile Fibre Optic Cable Infrastructure Deployment
  • Fibre optic distribution frame with rows of terminated patch cords
    Fibre Optic

    Ministry of Communication & ICT

    OPGW Fibre Optic Cable Works for NICTBB Routes

    Construction, installation, testing and commissioning services for OPGW optic fibre cable on National ICT Broadband Backbone routes.

    Location
    Tanzania (NICTBB routes)
    Completed
    2022 – 2023
    Contract value
    TSh 984,597,852
    View case study
    View project: OPGW Fibre Optic Cable Works for NICTBB Routes

Start a conversation

Tell us what you need to build, connect or protect

Send us the scope, the site list or just the problem. We will come back with a route, a plan and an itemised quotation.